Research Article

Research on the Source Mechanism and Source Prevention and Control System of Deep Rock Burst

Table 3

Drill cuttings experimental data statistics table.

TimeDrilling depthAverage
1234567

Return roadway19th Dec. 201712.19Drill cuttings3.203.173.003.002.902.933.103.04
Drilling rate1.601.401.231.301.181.291.451.35
4th Jan. 20181.4Drill cuttings1.802.102.152.002.202.302.102.09
Drilling rate0.900.920.880.860.901.011.000.92

Air inlet roadway18th Sept. 20179.18Drill cuttings2.02.02.22.32.21.71.62.0
Drilling rate1.00.880.901.0000.90.0750.760.88
1st Oct. 201710.1Drill cuttings1.82.12.152.02.22.32.12.09
Drilling rate0.900.920.880.860.901.011.000.92
11th Oct. 201710.11Drill cuttings2.42.152.352.552.151.92.352.26
Drilling rate1.200.950.961.100.880.831.111.00
12th Nov. 201711.12Drill cuttings2.02.12.32.32.42.32.12.21
Drilling rate1.000.920.941.000.981.011.000.98