Research Article
Mechanical and Deformation Characteristics and Optimization of Support Parameters for Superlarge-Span Tunnel: A Case Study from Laohushan Tunnel
Table 3
Field test items and measurement methods.
| Number | Measurement items | Measurement instrument | Instrument specifications | Measurement frequency |
| 1 | Horizontal convergence | TOPCON ES-101 total station | Accuracy: 1 mm | 3–15 days | 2-3 times/day | 16 days–1 month | 1 time/day | More than 1 month | 2-3 times/week | 2 | Crown settlement | TOPCON ES-101 total station | Accuracy: 1 mm | 3–15 days | 2-3 times/day | 16 days–1 month | 1 time/day | More than 1 month | 2-3 times/week | 3 | Steel rib stress | Steel string surface strain gauge | 2000 με | 1 time/day | 4 | Shotcrete stress | Concrete strain gauge | C25 | 1 time/day | 5 | Concrete stress in secondary lining | Concrete strain gauge | C30 | 1 time/day | 6 | Steel bar stress in secondary lining | Steel bar stress meter | HRB400 | 1 time/day |
|
|