Advances in Civil Engineering / 2020 / Article / Fig 1

Research Article

Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure

Figure 1

Schematic diagram of specified length for transition section in the code [8]. (a) The transition section between subgrade and bridge. (b) The transition section between bridge and tunnel.
(a)
(b)

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.