Research Article
Study of Deformation Behaviors and Mechanical Properties of Central Diaphragm in a Large-Span Loess Tunnel by the Upper Bench CD Method
Table 3
The accumulated crown settlement value at the monitoring section in Wangcun tunnel.
| Pile number | Part I in the upper bench | Vault (A) (mm) | Left arch waist (B) (mm) | Central diaphragm waist (C) (mm) | Maximum excavation line position at left arch (D) (mm) | Maximum excavation line position at central diaphragm (E) (mm) |
| YK11 + 937 | 131 | 131 | — | — | 25 | YK11 + 931 | — | 67 | 60 | — | 54 | YK11 + 928 | 51 | 52 | 41 | 58 | 45 | YK11 + 925 | 38 | 34 | 36 | 46 | 13 |
| Pile number | Part II in the upper bench | Vault (F) (mm) | Right arch waist (G) (mm) | Central diaphragm waist (C) (mm) | Maximum excavation line position at right arch (H) (mm) | Maximum excavation line position at central diaphragm (E) (mm) |
| YK11 + 937 | 35 | 53 | — | 40 | 25 | YK11 + 931 | 24 | 43 | 60 | 65 | 54 | YK11 + 928 | 21 | 23 | 41 | 36 | 45 | YK11 + 925 | 19 | 16 | 36 | 19 | 13 |
|
|