Research Article

Large Deformation Mechanics of Gob-Side Roadway and Its Controlling Methods in Deep Coal Mining: A Case Study

Table 1

Two-direction hydrofracturing parameters.

No.Length of hole (m)Diameter of hole (mm)Elevation angle of hole (°)Included angle between hole and roadway (°)Hole spacing (m)Fracturing time (min)Fracturing interval (m)Single-hole fracturing times

S40.550509016302-310–13
S′40.550503–58302-310–13