Research Article

Discrete Element Analysis of the Load Transfer Mechanism of Geogrid-Ballast Interface under Pull-Out Load

Figure 3

Establishment process of the numerical model for the pull-out test. (a) Plane view of geogrid configuration. (b) Two layers of initial ballast (front view). (c) Model of the pull-out test.
(a)
(b)
(c)