Research Article
In Situ Creep Model Testing for the Tunnel Anchor Foundation of Xingkang Suspension Bridge in Luding of China
Figure 7
(a) Loading system: data acquisition system, (b) site datum beam of model anchor, (c) temperature monitoring system, and (d) jack oil system of field loading system.