Research Article

Stability Control of Staged Filling Construction on Soft Subsoil Using Hyperbolic Settlement Prediction Method: A Case Study of a Tidal Flat in China

Table 2

Construction period in each stage.

Load gradeFilling height H (m)Embankment filling period (d)Earlier period of preloading (d)Control time in the latter part of the preloading period (d)

I0.81–34–1314–33
II1.3534–4546–5556–80
III1.2581–110111–121122–131
IV1.8132–163164–173174–193
V1.4194–206207–213214–306