Research Article

Seismic Damage Rapid Assessment of Road Networks considering Individual Road Damage State and Reliability of Road Networks in Emergency Conditions

Figure 2

Diagrammatic drawing of the subgrade type. (a) Embankment. (b) Cutting. (c) Half-filled and half-dug. (d) No digging and no filling.
(a)
(b)
(c)
(d)