Research Article
Seismic Damage Rapid Assessment of Road Networks considering Individual Road Damage State and Reliability of Road Networks in Emergency Conditions
Figure 2
Diagrammatic drawing of the subgrade type. (a) Embankment. (b) Cutting. (c) Half-filled and half-dug. (d) No digging and no filling.
(a) |
(b) |
(c) |
(d) |