Abstract

With the increase of mining depth in underground engineering, deep ground pressure has an extremely unfavorable impact on safety production and the economic benefits of coal mines and the control of the roadway stability in deep mines are gradually highlighted. In this study, the working face 14203 of the Zaoquan coal mine was taken as the engineering background, the deformation mechanism of surrounding rock in the deep-buried high-stress roadway was analyzed, and the hydraulic fracturing pressure relief technology in the advanced roadway was proposed for surrounding rock control. Finally, the numerical simulation and field tests were used to validate the comprehensive effect of the proposed technology. Without damaging the roadway stability in the working face, the hydraulic fracturing pressure relief technology can optimize the stress environment and stability of the roadway through the artificial control of the roof fracture position. The numerical simulation shows that under the action of hydraulic fracturing, the cutting slot is formed, the deformation and failure mode of the roof are changed, the stress of surrounding rock is reduced, and the development of the plastic zone of surrounding rock is limited. As a result, the stability of surrounding rock in the roadway is effectively protected. The field test shows that after the adoption of hydraulic fracturing pressure relief technology, the roof subsidence, floor separation, bolt stress, and cable stress decrease, and the deformation of surrounding rock is reduced significantly. Therefore, hydraulic fracturing pressure relief technology is verified as an effective method to control the large deformation of the surrounding rock in the deep-buried roadway.

1. Introduction

In recent years, the mining depth and mining scope have been continuously increased. Compared with the shallow mining, the geological process characteristics and mine pressure behavior law under the condition of deep mining have been changed greatly: for the deep mine, the vertical stress (caused by the gravity) and the in situ stress are higher, and the tectonic stress field is more complex. Deep ground pressure has an extremely unfavorable impact on safety production and economic benefits of coal mines [13]. In the deep mining, the deformation characteristics of coal rock are changed from brittleness to plasticity, and the dilatancy and the impact risk of coal rock are increased. In the deep roadway, complex geological conditions and high ground stress fields often cause serious deformation and failure of surrounding rock [4, 5]. Therefore, the deformation and failure of surrounding rock should be effectively controlled under the strong mine pressure in deep mining to ensure safe mining.

Research on the deformation mechanism and stability of surrounding rock of deep high-stress roadway has been widely performed. Zhang [6] studied the loose blasting and pressure release channel of surrounding rock through the FLAC numerical simulation software. To solve the problem of roadway deformation in short cantilever beam roof excavation theory, Yang et al. [7] proposed the roof excavation pressure relief method in the adjacent roadway and determined the presplit blasting technical parameters through theoretical analysis. Yang et al. [8] studied the stress process of bolt on the roof by three-dimensional numerical simulation, analyzed the time effect of bolt mechanical properties, and summarized the working mechanism of floor bolt. He et al. [9, 10] pointed out that in the deep coal mining, the rock mass medium is in the stage of large plastic deformation, leading to more significant nonlinear mechanical phenomena; as for the supporting technology, the coupling of the strength, stiffness, and structure between the support body and the surrounding rock should be considered. Zuo et al. [11] systematically analyzed the macro/meso failure mechanism of deep rock or coal rock combinations under different loading conditions. The stress gradient failure theory of surrounding rock, the hyperbolic movement model of uniform support in the deep roadway, and overburden simulation were established, and the combined grouting control technology of surface and underground was proposed. In addition, Xiao et al. [1216] studied the failure mechanism and control measures of soft rock in the deep roadway.

In previous studies, hard roof collapse behind the working face has been mainly investigated, while the study on stability control of deep roadway has been rarely reported. The working face 14203 in the Zaoquan coal mine was a typical deep mining face with a large mining height. Under the joint influence of large buried depth, high stress, and advanced mining, large deformation occurred in the roadway. According to the stress environment of the roadway, on the premise of not affecting the production of the working face and the integrity of the presplit roadway roof, the hydraulic fracturing pressure relief technology for surrounding rock control was performed in the advanced roadway of the working face. Besides, theoretical analysis, numerical simulation, and field tests were employed to study the mechanism of the hydraulic fracturing pressure relief technology and its implementation effect. The research results can provide a reference for roadway stability control under similar conditions.

2. Engineering Background

2.1. Production and Geological Conditions

Zaoquan coal mine was located at the edge of Maowusu Desert, which was 62 km southeast of the Lingwu City, Ningxia Hui Autonomous Region. Its geographical coordinates were 106°30′-106°35′ E and 37°52′-38°02′ N. The coal seam 2 of the working face 14203 was the main fully mechanized working face with a large mining height. The thickness of coal seam 2 was 8.07–8.39 m, the dip angle was 2°–13°, the strike length was 2336 m, and the dip length was 182.82–235 m. The direct roof was composed of siltstone, mudstone, and carbonaceous mudstone, with an average thickness of 10.90 m; the main roof was composed of medium-grained sandstone and fine-grained sandstone and siltstone, with an average thickness of 35.45 m. The floor was composed of mudstone, siltstone, and fine-grained sandstone, with an average thickness of 5.64 m. The east side of the working face was the excavated area, the south side was the F69 normal fault of No. 13 and No. 14 mining areas, the west side was the old goaf of the working face 14202. Between the working face 14203 and the goaf, there was a coal pillar of 14 m. The north side was the 2nd and 3rd middle yard of No. 14 mining area, and there was no goaf in the upper part of the working face. The buried depth of the rubber-tire haulage gateway in the fully mechanized working face 14203 was about 660 m, and the buried depth of the return airway was about 627 m. The cross section sizes of the rubber-tire haulage gateway and the return airway of the working face 14203 were 4500 mm × 3550 mm with the joint support of anchor, mesh, and cable, as shown in Figure 1.

2.2. Analysis of Deformation Characteristics of the Test Roadway
2.2.1. Deformation Characteristics of the Test Roadway

Due to the joint influence of the large buried depth, high ground stress, and advanced mining of the working face, the roof subsidence, floor heave, and serious shrinkage of two sides appeared in the rubber-tire haulage gateway and return airway. The roadway deformation within 30 meters ahead of the working face was still severe (serious roof subsidence, floor heave, and side shrinkage), the erected steel beam shed was compressed and fractured, and the single hydraulic prop was bent. As shown in Figure 2, the roof sank and pressed on the transfer machine section, and the transfer machine and end support were unable to move normally, which seriously affected the safety production of the working face.

2.2.2. Cause Analysis of Roadway Deformation

The complex structures such as large faults and collapse columns have not been exposed during the excavation process of the rubber-tire haulage gateway in the working face 14203. However, due to its large buried depth (660 m), the in situ stress environment had an important impact on the roadway deformation. In the field, the SYY-56 Small Aperture Hydraulic Fracturing In Situ Stress Measurement System produced by Xi’an Zhongzhou Geotechnical Technology Co., Ltd., was used, and measurement stations at four typical positions of working faces 14203 and 14201 were set to measure the in situ stress near the roadway. As shown in Figure 1, the fracture pressure (Pb), fracture tension pressure (Pr), instantaneous closing pressure of hydraulic fracture surface (Ps), and in situ tensile strength (T) of rock in each measuring section were determined. According to the relevant formulas, the main stress value is shown in Table 1.

As shown in Table 1, there was large stress at the measuring points in the test area, and the value of vertical principal stress increases gradually with the increase of the buried depth. The underground in situ stress field type was stress field, and the four measuring points were NNE direction. In a word, ground stress was an important factor causing serious deformation of the roadway. At the same time, the average thickness of the main coal seam in the working face 14203 was 8.2 m, belonging to the large mining-height working face. Compared with the thin coal seam mining, the overburden movement in the goaf of the working face with the large mining height was more intense after mining. As a result, the rubber-tire haulage gateway was disturbed, and the roadway deformation was inevitably caused.

3. Roof Hydraulic Fracturing Pressure Relief for Surrounding Rock Control

3.1. Mechanism of Roof Hydraulic Fracturing Pressure Relief and Roadway Protection

To ensure the normal connection of the working face, the roadway of the next working face is often excavated in advance. When the current working face is mined, the coal pillar between the adjacent working faces will become the stress concentration area, and the roadway serving the next working face will be in a stress concentration environment. As a result, serious roadway deformation is caused, especially in the condition of large buried depth. In this study, the roof hydraulic fracturing pressure relief technology was performed as follows: before the mining of the working face with a large mining height, a special slotting bit was used to prefabricate a transverse slot in the roof drilling; then, the transverse slot section was sealed. The high-pressure water was used to produce cracks at the end of the slot and expand along with the rock layer, and then a “quasifracture surface” was formed in the overburden strata of the roadway pillar. During the mining of the working face, under the action of periodic pressure of stope, the roof of goaf broke along the “quasifracture surface;” the span of cantilever beam was reduced, the action time of lateral abutment pressure was shortened, the stress transmitted by the lateral cantilever beam to the coal pillar of roadway protection was unloaded or transferred, and then the stress state of roadway retaining was improved [1721]. Finally, the difficulty of roadway maintenance was reduced and the safe production of mine was ensured, as shown in Figure 3.

3.2. Numerical Simulation of Hydraulic Fracturing Pressure Relief in the Roof and Roadway Protection
3.2.1. Numerical Calculation Model and Schemes

Based on the geological data of the mine, a numerical calculation model was established by the FLAC6.0 software. The size of the model was 250 m in length, 100 m in width, and 80 m in height, with a total of 2,000,000 grids. The interface unit was used to establish 11 structural planes. A total of 12 strata were simulated from the fine sandstone of the basic floor to the topsoil, as shown in Figure 4. Table 2 shows the mechanical parameters of rock mass.

According to the Mohr–Coulomb criterion, the maximum unbalance force of the model was monitored during the calculation process. When the equilibrium state was obtained in the model, the simulated vertical stress level was 16 MPa, and the horizontal stress level was 12 MPa. The simulated calculation level was kept at the same level as the monitored in situ stress, as shown in Figure 5. To compare the influence of hydraulic fracturing on the stability of surrounding rock in the roadway, two models were designed for comparative analysis according to the design scheme of hydraulic fracturing drilling parameters .Scheme 1: the influence of nonhydraulic fracturing in the roof on the stability of rubber-tire haulage gateway 14203 was simulated. According to the data provided by the mining enterprise, the goaf, the return airway, the working face 14203, the rubber-tire haulage gateway, and the auxiliary haulage gateway were excavated in coal seam 2. To meet the needs of numerical simulation calculation, the goaf was reserved for 15 m; the size of return airway, rubber haulage gateway, and auxiliary haulage gateway was 4.5 m × 3.55 m; the distance between the roadway and the coal pillar of 20 m was reserved in the goaf; and the maximum boundary limit of the working face was reserved for 130 m as shown in Figure 6(a).Scheme 2: the influence of roof hydraulic fracturing on the stability of rubber-tire haulage gateway 14203 was simulated. According to the relevant theoretical analysis, the Interface command was used to generate a crack at 45° along the side face of the rubber-tire haulage gateway, and the length of the crack was 50 m. The other crack was distributed at 5° along the coal pillar, and the length of the crack was 50 m as shown in Figure 6(b). After the working face 14203 advanced 20 m in the working face 14203, the stress distribution and deformation characteristics of the surrounding rock of the roadway were analyzed and compared in the two schemes.

3.2.2. Simulation Results

(1) Influence of Hydraulic Fracturing Pressure Relief on the Stress of the Surrounding Rock. Figure 7 shows the vertical stress distribution nephogram of the two schemes. As shown in Figure 7(a), when roof hydraulic fracturing of rubber-tire haulage gateway is not performed, the low-stress (less than 6 MPa) areas are mainly concentrated in the position of 20 m above and below the goaf and 5–8 m above and below the excavated roadway. These areas are prone to tensile failure. The relatively high-stress (above 11 MPa) areas are mainly concentrated in the upper 30 m of the model, and the concentrated stress of the 20 m coal pillar is even as high as 20 MPa. As shown in Figure 7(b), due to the existence of cutting slot after the roof hydraulic fracturing, the low-stress (less than 6 MPa) area increases significantly, mainly concentrated in the excavation roadway and the upper 50 m range of goaf. At the same time, the stress between 20 m coal pillars decreases from the original 20 MPa above to 12–15 MPa, decreasing by about 40%. The relatively high-stress (16 MPa) areas are mainly concentrated in the upper 10 m of the model. On the whole, after hydraulic fracturing, the area of high-stress concentration above the rubber-tire haulage gateway and in the direction of the coal pillar is obviously reduced. As a result, the damage degree of the area is greatly reduced, and the stability of the roadway is significantly enhanced.

(2) Influence of Hydraulic Fracturing Pressure Relief on the Plastic Zone of Surrounding Rock. Figure 8 shows the change of plastic zone of surrounding rock in the roadway before and after hydraulic fracturing pressure relief. As shown in Figure 8(a), the roof subsidence in the nonhydraulic fracturing section is not sufficient, and the plastic zone is about 15 m in the upper part. The plastic zone of coal pillar is fully developed on the side of the rubber-tire haulage gateway, and there is a range of 2–5 m free of plastic failure in the middle of the 20 m coal pillar. The development range of the plastic zone in the upper roof is 8 m, and the plastic zone in the shallow roof and floor is dominated by tensile failure and the two sides and other deep areas by shear failure. It indicates that the deformation and failure of the surrounding rock of the rubber-tire haulage gateway are also serious. At the same time, the plastic zone in the two sides of the auxiliary haulage gateway is affected by the vertical stress, and the influence range is more than 8 m. The influence range in the roof and floor is more than 5 m.

As shown in Figure 8(b), due to the existence of hydraulic fractures, the plastic zone in the upper part of the mined roof is fully developed and the roof subsidence is sufficient. The plastic zone on the side of the rubber-tire haulage gateway changes obviously. The plastic zone of the 20 m coal pillar is less than 5 m, and the plastic zone of the roof is reduced by about 50%, which greatly reduces the deformation and failure of the roof and coal wall. The plastic zone of the two sides of the auxiliary haulage gateway is reduced to less than 4 m, and the development range of the roof and floor is less than 4 m. Compared with the nonhydraulic fracturing section, the reduction of plastic zone is obvious in the hydraulic fracturing section. It indicates that hydraulic fracturing is more conducive to reducing the mining influence and roadway deformation and maintaining the stability of the roadway.

(3) Influence of Hydraulic Fracturing Pressure Relief on the Deformation of Surrounding Rock. Figure 9 shows the distribution of displacement and deformation curve of rubber-tire haulage gateway 14203 in the two schemes. Through the comparison, it can be seen that the displacement of surrounding rock of roadway in hydraulic fracturing section decreases significantly, with an overall decrease of about 45.8%. The floor and the left and right sides have the most prominent decrease. The left side decreases from about 435 mm to about 377 mm, and the right side decreases from about 434 mm to about 174 mm. The change of floor is the biggest, and the decrease is about 365 mm before and after hydraulic fracturing. The displacement of surrounding rock decreases obviously, which is positively correlated with the plastic zone distribution of surrounding rock. It shows that hydraulic fracturing technology reduces the influence of mining on roadway deformation and maintains the stability of the roadway.

4. Engineering Practice

4.1. Hydraulic Fracturing Parameter Design

To ensure the normal production of the working face, the drilling was carried out at the position of rubber-tire haulage gateway 14203, which was 120 m away from the working face. Figure 10 shows the hydraulic fracturing parameters and roadway support parameters of the rubber-tire haulage gateway in the working face 14203. The construction sequence was as follows: observation of roof rock structure with a peep scope ⟶ in situ test of roof rock strength ⟶ determination of fracturing parameters ⟶ fracturing drilling operation ⟶ implementation of fracturing ⟶ fracturing monitoring. The underground construction started on July 20, 2019, and ended on January 20, 2020. The length of the test roadway in the working face 14203 was 300 m, and a total of 60 boreholes were constructed:(1)The fracturing boreholes were arranged along the axial direction of the haulage gateway. The opening position was about 1 m away from the coal pillar, and the included angles with the roadway were 45° and 5°, respectively, as shown in Figures 10(a) and 10(b). The actual angle and opening position were adjusted according to the field space.(2)The length of boreholes was 50 m, the dip angle was 50°, and the spacing was 10 m, as shown in Figure 10(c).(3)Roadway support parameters: two corners of the roadway roof were supported by the ∅21.98 mm × 4300 mm (1 × 19) anchor cables. The dip angle of anchor cables was 15°, the preload was more than 200 kN, and the row spacing between anchor cables was 1000/600 × 900 mm. The top of the cable truss was arranged for support, the specification of this cable was 21.98 mm × 8300 mm, and the cable preload was greater than 200 kN. The anchor cable trusses L = 3800 mm were arranged symmetrically along both sides of the center line, and the row spacing was 900 mm. The W280 × 5 × 4700-1000/600-6 type W steel strip was used for the top support. The φ6.5 mm round steel welded steel mesh was hung at the top of the roadway, and the mesh size was 100 × 100 mm. The 20#-M22-2000 BHRB335 left-handed rebar bolt without longitudinal bar was adopted at the side of the roadway. The tensile force of the bolt at the side was greater than 50 kN, the row spacing between the bolts was 900 × 900 mm, and the spray layer with a thickness of 400 mm was laid on the bottom plate, as shown in Figure 10(d).

4.2. Monitoring Content and Scheme

In the working face 14203, three measuring stations were respectively arranged in the hydraulic fracturing section and nonhydraulic fracturing section, with a total of six measuring stations. The interval of stations was 100 m, as shown in Figure 11. The hydraulic fracturing section was 120 m away from the working face. The surface displacement of the roadway, roof separation, and anchor cable stress were mainly monitored.

4.3. Engineering Effect

The monitoring results of 5# station in the nonhydraulic fracturing section and 2# station in the hydraulic fracturing section of the rubber-tire haulage gateway in the working face 14203 were compared and analyzed.

4.3.1. Roadway Surface Displacement

According to the monitoring results of 5# station and 2# station, the roadway surface displacements of nonhydraulic fracturing section and hydraulic fracturing section in the working face 14203 are plotted respectively, as shown in Figures 12 and 13. The maximum roof subsidence of the nonhydraulic fracturing section is 310 mm, the maximum floor heave is 760 mm, the maximum displacement of the left side is 607 mm, and the maximum displacement of the right side is 409 mm. When the hydraulic fracturing section is 110 m away from the working face, the surrounding rock of the roadway has obvious displacement changes. When it is 80 m away from the working face, the displacement of surrounding rock rapidly increases. However, compared with the nonhydraulic fracturing section, the roof subsidence, floor heave, left side, and right side of the hydraulic fracturing section decrease by 52.2%, 53.8%, 59.2%, and 44.5%, respectively. At the same time, when the hydraulic fracturing section is 90 m away from the working face, the displacement of the surrounding rock of the roadway changes; when it is 80 m away from the working face, the displacement of surrounding rock of roadway increases rapidly. Therefore, hydraulic fracturing has an obvious effect on the roadway stability control.

4.3.2. Roof and Floor Separation of Roadway

The separation amount of roof and floor in the roadway is also the rock movement amount at the roof and floor of the roadway. According to the monitoring results of 5# station and 2# station, the roof and floor separation of nonhydraulic fracturing section and hydraulic fracturing section in working face 14203 are drawn, as shown in Figures 14 and 15. When the distance from the working face is 130 m, the roof separation of roadway occurs in the nonhydraulic fracturing section (monitored by 5# station), which is consistent with the response of roof subsidence. It indicates that the separation and roof subsidence have a positive correlation. When the distance from the working face is 60 m, the amount of roof separation begins to increase rapidly. When the distance from the working face is 0 m, the maximum value of the deep base point is 186 mm, and the maximum value of the shallow base point is 68 mm. However, in the hydraulic fracturing section, when the distance is 100 m away from the working face, the roof separation occurs (monitored by 2# station). When the distance from the working face is 65 m, the amount of roof separation is significant. When the distance from the working face is 0 m, the maximum values are obtained. The maximum value of the deep base point is 164.7 mm, and that of the shallow base point is 22 mm in the hydraulic fracturing section, which is 22.6% and 60% less than that of the nonhydraulic fracturing section. The amount of roof separation presents the characteristics of decreasing from deep to shallow.

4.3.3. Bolt Stress

(1) Stress Analysis of Side Bolt of Coal Pillar. Figures 16 and 17 show the stress curves of the bolts at the coal pillar side of 5# and 2# stations, respectively. It can be seen that the stress of the upper 2# bolt in the nonhydraulic fracturing section is less than that of the lower 1# bolt, and the stress of the two bolts shows a gradually increasing trend. This suggests that the lower bolt is obviously affected by the floor heave, and the stress is obviously larger. With the advance of the working face, the stress of the bolt increases gradually. When the distance from the working face is 0 m, the stress of the upper 2# bolt reaches the maximum value of 163.8 kN, and the stress of the lower 1# bolt increases to 105.3 kN and does not change. When the distance is 100 m away from the working face in the hydraulic fracturing section, the bolt stress on the side of the coal pillar begins to increase, in which 2# bolt increases more rapidly than the lower 1#. It indicates that the pressure on the upper part of the coal pillar is faster. When it is 65 m away from the working face, the stress of the upper 2# bolt reaches the maximum value of 112 kN and suddenly decreases to 0 kN. The actual observation shows that the bolt tail breaks off. The stress of the lower 1# bolt increases continuously until it reaches 85 kN and does not change. Compared with the nonhydraulic fracturing section, the stress of the side bolt of the coal pillar in the hydraulic fracturing section is reduced by 12.3%–31.9% on average.

(2) Stress Analysis of Side Bolt in the Mining Face. Figures 18 and 19 show the stress curves of the bolts at the mining face of 5# and 2# stations, respectively. As shown in Figure 18, the stress of 3# bolt in the nonhydraulic fracturing section decreases slowly at the later stage, while the stress of the lower 4# bolt increases greatly at the later stage. When the distance from the working face is 30 m, the stress of the upper 3# bolt reaches the maximum value of 84 kN, and the stress drops sharply to 0, and the stress of the lower 4# bolt begins to rise rapidly. When the distance from the working face is 0 m, the stress of the lower 4# bolt reaches 136 kN. As shown in Figure 19, the supporting force of 3# bolt in the hydraulic fracturing section fluctuates strongly in the later stage, while that of 4# bolt increases steadily. When it is 15 m away from the working face, the maximum stress of the upper 3# and lower 4# bolts is 78 kN and 42 kN. Then the stress of the upper 3# bolt decays. Finally, the upper 3# bolt is stable at about 57 kN, and the lower 4# bolt reaches the maximum value of 46 kN. The stress of the side bolt in the hydraulic fracturing section is 56.1%–51.8% less than that in the nonhydraulic fracturing section.

4.3.4. Anchor Cable Stress

(1) Stress Analysis of the Anchor Cable at Coal Pillar Side. Figures 20 and 21 show stress curves of anchor cable at coal pillar side of 5# and 2# measuring stations, respectively. As shown in Figure 20, with the advance of the working face, the stress of anchor cable in the nonhydraulic fracturing section increases continuously. When it is 30 m away from the working face, the stress of anchor cable decreases rapidly. With the decreasing distance to the working face, the stress of anchor cable increases continuously until the distance is about 0 m. The stress of 5# anchor cable reaches the maximum value of 239 kN and that of 6# anchor cable reaches more than 500 kN. These conditions are consistent with the characteristics of roof subsidence. As shown in Figure 21, when hydraulic fracturing technology is adopted and the distance from the working face is 60 m, the stress of 6# and 5# fluctuates, indicating that the roof failure fluctuates. When the distance is 1 m away from the working face, the stress reaches the maximum value of 502 kN and 116 kN, with an average reduction of 44.8% and 16.4%.

(2) Stress Analysis of the Side Anchor Cable in Mining Face. Figures 22 and 23 show the stress curves of the anchor cable at the mining face of 5# and 2# measuring stations, respectively. As shown in Figure 22, for the nonhydraulic fracturing section, when the distance is 100 m away from the working face, the stress of the anchor cable begins to increase, which synchronizes with the increase of roof subsidence and separation amount. With the advance of the working face, the stress of the anchor cable continues to increase until the distance is 0 m away from the working face and then the stress remains relatively stable. The stress of the outer 8 # anchor cable is 205 kN and the inner 7 # anchor cable is 242 kN. As shown in Figure 23, for the hydraulic fracturing section, with the advance of the working face, the stress of the anchor cable increases and remains stable until the distance is 10 m away from the working face. The stress of the 7 # anchor cable is 216 kN and that of the 8 # anchor cable is 47 kN. Compared with the nonhydraulic fracturing section, the stress of anchor cable is reduced by 48% and 51.3% on average in the hydraulic fracturing section.

5. Conclusion

(1)On the premise of not destroying the stability of roadway in working face, the fracture position of the roof can be artificially controlled, and the high-stress from the lateral cantilever beam of the working face to the coal pillar of the retained roadway can be unloaded or transferred to improve the stress state of the retained roadway.(2)Hydraulic fracturing pressure relief technology changes the deformation and failure mode of roof and restricts the development of the plastic zone of surrounding rock in the roadway. As a result, the deformation and failure of roof and coal sides are greatly alleviated, and the stress of anchor bolt and anchor cable is reduced to varying degrees.

Data Availability

The data in this paper were obtained by field measurement and laboratory test.

Conflicts of Interest

The authors declare no conflicts of interest.

Authors’ Contributions

Formal analysis was carried out by P. Z. and X. M.; funding acquisition was made by N. L.; investigation was conducted by Y. G.; methodology was employed by Y. J. and K. M.; the original draft was written by W. Z.; reviewing and editing were done by W. Z. All authors have read and agreed on the published version of the manuscript.

Acknowledgments

This work was supported by the National Natural Science Foundation of China (Nos. 52104103, 52174128, and 51774269), the Natural Science Foundation of Jiangsu Province (Nos. BK20210499 and BK20190031), National Science Fund for Excellent Young Scholars (No. 52022107), and the China Postdoctoral Science Foundation (No. 2020M681771).