Research Article
Dynamic Probability Analysis for Construction Schedule Using Subset Simulation
Algorithm 3
Subset simulation-based PCPM.
(1) | generate initial samples: | (2) | repeat | (3) | compute in -th batch samples | (4) | compute | (5) | if | (6) | select seeds and intermediate failure event using method in Section 3.2.1 | (7) | generate next batch of samples using method in Section 3.2.2 | (8) | else | (9) | break | (10) | return |
|