Research Article
Dynamic Probability Analysis for Construction Schedule Using Subset Simulation
Figure 10
A schedule network of a real project. (a) Illustration of working segments: each segment is composed of several working packages and constructed floor by floor. (b) Illustration of working dependencies: there are three special nodes which are a starting point, an ending point, and a midway checkpoint. Their durations are assigned with zero day.
(a) |
(b) |