Research Article

Dynamic Probability Analysis for Construction Schedule Using Subset Simulation

Table 1

Schedule network failure evaluation comparison (deadline = 85 days).

MethodsFailure probability (%)Variation coefficientRunning time (sec.)

MCPMLUBE1.93N/A0.00
FCPMTriangular19.57N/A0.00
PCPMDirect MCS2.252.45%2.58
Our method2.243.11%0.35