Research Article

Dynamic Probability Analysis for Construction Schedule Using Subset Simulation

Table 3

Schedule network failure evaluation comparison (deadline = 690 days).

MethodsFailure probability (%)Variation coefficientRunning time (sec.)

MCPMLUBE2.83N/A0.54
FCPMTriangular31.13N/A0.26
PCPMDirect MCS3.112.17%26.32
Our method3.135.27%1.32