Research Article

Case Study on Safety Assessment of Rockfall and Splash Stone Protective Structures for Secondary Excavation of Highway Slope

Table 1

Rockfall protection scheme.

SchemeArrangement

12 m height bamboo retaining at slope toe
22 m height protective structure at slope toe + 1.5 m bamboo retaining at first platform
32 m height bamboo retaining at slope toe + 1.5 m bamboo retaining at second platform
42 m bamboo retaining at slope toe + 1.5 m bamboo retaining at third platform
52 m bamboo retaining at slope toe + 1.5 m bamboo retaining at slope top