Research Article

Researches on the Influence of Blasting of Newly Built Tunnel on the Existing Tunnel Structure with Small Cross Angle

Table 4

The arrangement of testing conditions.

No.Maximum charge per delay Q (kg)Surrounding rockClear distance D (m)Cross angle α (°)Blasting methods

126.50III16.9030°Full-section method
213.14III16.9030°Bench method
313.14IV16.9030°Bench method
413.14III16.9015°Bench method
513.14III16.9045°Bench method
613.14III8.4530°Bench method
713.14III25.3530°Bench method