Research Article
Researches on the Influence of Blasting of Newly Built Tunnel on the Existing Tunnel Structure with Small Cross Angle
Table 4
The arrangement of testing conditions.
| No. | Maximum charge per delay Q (kg) | Surrounding rock | Clear distance D (m) | Cross angle α (°) | Blasting methods |
| 1 | 26.50 | III | 16.90 | 30° | Full-section method | 2 | 13.14 | III | 16.90 | 30° | Bench method | 3 | 13.14 | IV | 16.90 | 30° | Bench method | 4 | 13.14 | III | 16.90 | 15° | Bench method | 5 | 13.14 | III | 16.90 | 45° | Bench method | 6 | 13.14 | III | 8.45 | 30° | Bench method | 7 | 13.14 | III | 25.35 | 30° | Bench method |
|
|