Research Article

Researches on the Influence of Blasting of Newly Built Tunnel on the Existing Tunnel Structure with Small Cross Angle

Table 6

The dynamic response of the existing tunnel to blasting under different cross angle conditions.

ItemsVibration velocity (cm/s)Lining stress (MPa)Displacement (mm)
Tunnel position153045153045Direction153045

Vault1.341.050.68−3.20−3.20−3.20X0.800.881.30
Left waist2.682.302.014.604.023.52
Left foot5.955.304.661.651.130.51Y3.103.103.15
Bottom4.253.552.850.320.210.16
Right foot2.121.681.221.661.130.51Z5.885.855.83
Right waist0.980.840.724.454.023.52