Researches on the Influence of Blasting of Newly Built Tunnel on the Existing Tunnel Structure with Small Cross Angle
Table 7
The dynamic response of the existing tunnel to blasting under different clear distance conditions.
| Items | Vibration velocity (cm/s) | Lining stress (MPa) | Displacement (mm) | Tunnel position | 8.45 | 16.90 | 25.35 | 8.45 | 16.90 | 25.35 | Direction | 8.45 | 16.90 | 25.35 |
| Vault | 1.45 | 1.05 | 0.26 | −3.20 | −3.20 | −3.20 | X | 1.71 | 0.88 | 1.12 | Left waist | 3.54 | 2.30 | 1.29 | 5.32 | 4.02 | 2.90 | Left foot | 8.64 | 5.30 | 3.10 | 1.48 | 1.13 | 0.46 | Y | 3.25 | 3.10 | 3.10 | Bottom | 5.76 | 3.55 | 2.06 | 0.35 | 0.21 | 0.08 | Right foot | 2.45 | 1.68 | 0.91 | 1.48 | 1.13 | 0.46 | Z | 6.00 | 5.85 | 5.81 | Right waist | 1.26 | 0.84 | 0.38 | 5.32 | 4.02 | 2.90 |
|
|