Research Article
The Prediction of Pile Foundation Buried Depth Based on BP Neural Network Optimized by Quantum Particle Swarm Optimization
Table 2
10 groups of data for prediction.
| No. | Pile number | Borehole number | X-coordinate | Y-coordinate | Z-coordinate | h1 (m) | h2 (m) | h3 (m) | h4 (m) | H (m) |
| 1 | 314 | K32 | 14.4510 | 136.7880 | 31.9800 | 0.50 | 11.00 | 4.90 | 8.10 | 24.50 | 2 | 350 | K33 | 25.0510 | 124.4880 | 31.8700 | 1.20 | 10.60 | 5.20 | 7.40 | 24.40 | | | | | | | | | | | | 9 | 306 | K29 | 97.5713 | 103.1992 | 32.0300 | 0.40 | 14.30 | 3.90 | 5.90 | 24.50 | 10 | 269 | K28 | 74.0510 | 102.5880 | 31.9100 | 1.10 | 13.10 | 5.00 | 5.20 | 24.40 |
|
|