Research Article

The Modelling of Digital Twins Technology in the Construction Process of Prefabricated Buildings

Figure 11

The total variance data of the construction risk index situation are as follows: (a) the initial feature value; (b) the extraction of the sum of squares and loaded; (c) the rotation of the sum of squares and loaded.
(a)
(b)
(c)