Advances in Civil Engineering / 2021 / Article / Fig 8

Research Article

The Influence of the Instantaneous Collapse of Tailings Pond on Downstream Facilities

Figure 8

The evolution process of tailings-and-water flow following dam break at one-third of the accumulation dam height. (a) First minute; (b) third minute; (c) fifth minute; (d) tenth minute; (e) twentieth minute; (f) thirtieth minute. The tailings pond collapsed at the elevation of the starter dam crest instantly.
(a)
(b)
(c)
(d)
(e)
(f)

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.