Research Article
Study on Parameter Optimization and Mechanism of Rigid-Flexible Coupling Underground Engineering Structure of Steel Panel and Polymer
Figure 4
Formation of the polymer-steel panel coupling structure [44]. (a) Grouting is carried out behind the steel panel. (b) Polymer composite layer is behind the steel panel.
(a) |
(b) |