Research Article

Subsidence Control Design Method and Application to Backfill-Strip Mining Technology

Table 1

Size of each working surface.

Working faceStrike length (m)Incline length (m)Width of the residual coal pillar (m)

11501 backfilling working face3718010
11502 caving mining working face444/6219910
11503 backfilling working face621/80810310
11504 caving mining working face700/80811810
11505 backfilling working face574/7009610
11506 caving mining working face416/57410010