Research Article

Subsidence Control Design Method and Application to Backfill-Strip Mining Technology

Table 2

Predicted parameters of PIM in the case of the first mining.

Mining depth (m)QbTan βθ (°)S (H)

300–5000.620.31.885.20.08
550–10000.580.31.74