Journals
Publish with us
Publishing partnerships
About us
Blog
Advances in Civil Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Advances in Civil Engineering
/
2021
/
Article
/
Tab 3
/
Research Article
Subsidence Control Design Method and Application to Backfill-Strip Mining Technology
Table 3
Predicted parameters of PIM in the case of repeated mining.
Mining depth (m)
Q
b
Tan
β
θ
(°)
S (H)
300–500
0.68
0.3
2.4
87
0.06
550–1000
0.60
0.3
2.2