Research Article

Subsidence Control Design Method and Application to Backfill-Strip Mining Technology

Table 8

Benefit comparison of different coal mining schemes under buildings.

Mining schemeDamage level of surface buildingsVillage treatment schemeMinable coal volume (10,000 tons)Filling cost (ten thousand yuan)Mining technical issuesSocial issues

Backfilling miningLevel I damageRepair compensation542160Low coal mining efficiency, and high filling costsThe surface subsidence is small, and the buildings are effectively protected.
Backfill-strip miningLevel I damageRepair compensation541200High resource recovery rate and low filling costsThe surface subsidence is small, and the buildings are effectively protected.
Strip miningLevel I damageRepair compensation23ā€”Low resource recovery rateThe surface subsidence is small, and the buildings are effectively protected.
Caving miningLevel II damageVillage relocation54ā€”The mining technology is mature.The surface subsidence is large, a large number of buildings need to be relocated, the relocation cost is high, and the surface ecological environment has been destroyed.