Research Article
Stability of a Rock Tunnel Passing through Talus-Like Formations: A Case Study in Southwestern China
Table 2
Measurement items for mechanical characteristics of the primary lining.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: the primary lining deformation was measured twice a day at 8 am and 6 pm, whereas the surrounding rock pressure and steel arch stress were measured once a day at 6 pm. Therefore, the monitoring data in the following used the data recorded at 6 pm. |