Research Article

Disturbance Effect of Pipe Jacking Group Adjacent Excavation on Surrounding Soil

Figure 14

Variation diagram of pore water pressure during Hole 2 jacking. (a) Pore water pressure of No. 2 monitoring hole. (b) Pore water pressure of No. 3 monitoring hole. (c) Pore water pressure of No. 4 monitoring hole. (d) Pore water pressure of No. 5 monitoring hole. (e) Pore water pressure of No. 6 monitoring hole.
(a)
(b)
(c)
(d)
(e)