Research Article
Comparison of BIM Adoption Models between Public and Private Sectors through Empirical Investigation
Table 9
Interconstruct correlation (discriminant validity) for public construction projects.
| | RA | C | CO | TOS | OR | FC | CB | SCF | GP | COP | CP |
| RA | 0.831 | | | | | | | | | | | C | 0.539 | 0.930 | | | | | | | | | | CO | 0.385 | 0.546 | 0.835 | | | | | | | | | TOS | 0.408 | 0.468 | 0.321 | 0.875 | | | | | | | | OR | 0.360 | 0.178 | 0.116 | 0.173 | 0.886 | | | | | | | FC | 0.339 | 0.417 | 0.249 | 0.378 | 0.089 | 0.850 | | | | | | CB | 0.745 | 0.586 | 0.536 | 0.435 | 0.257 | 0.360 | 0.901 | | | | | SCF | 0.598 | 0.675 | 0.432 | 0.516 | 0.329 | 0.375 | 0.635 | 0.862 | | | | GP | 0.694 | 0.835 | 0.571 | 0.440 | 0.349 | 0.358 | 0.806 | 0.688 | 0.950 | | | COP | 0.570 | 0.396 | 0.270 | 0.686 | 0.206 | 0.370 | 0.453 | 0.507 | 0.472 | 0.845 | | CP | 0.043 | −0.05 | 0.008 | 0.194 | 0.287 | -0.05 | 0.165 | 0.077 | 0.110 | 0.381 | 0.811 |
|
|
The diagonal values are the square root values of AVE values of each driver.
|