Research Article

Numerical Simulation and Optimization Design of End-Suspended Pile Support for Soil-Rock Composite Foundation Pit

Table 1

General situation of the subway station foundation pit.

StationMaximum excavation depth (m)Buried depth of rock stratum (m)Length (m)Width (m)Main support structure

Gongye South Road station17.59~18229.021.7End-suspended pile