Research Article

FEA of Effects Induced by Diurnal Temperature Variation on Downstream Surface of Xiaowan Arch Dam

Figure 9

Stress contour at the downstream side of Xiaowan arch dam in winter (76 h): (a) the maximum principal stress and (b) the Z-direction stress.
(a)
(b)