Research Article

Examination of Structures Built with Tunnel Formwork in Terms of Strength and Cost according to the Earthquake Regulations of 2007 and 2018

Table 15

BK structure quantities.

5 floors10 floors15 floors
200720182007201820072018

BS30 concrete, m³1987.21987.22981.82981.83977.53977.5
Concrete formwork, –m210413.510413.518831.018831.027335.727335.7
Base slab120.7120.7120.7120.7120.7120.7
Shear wall1086.01086.01071.81071.81071.81071.8
Flooring577.2577.2577.2577.2577.2577.2
Beam52.252.251.951.951.951.9
S420C reinforcement (thin), kg66252.466363.9119065.6114285.7170829.6162764.8
S420C reinforcement (thick), kg82650.283000.097536.998654.0114719.3119803.8
S420C reinforcement (total), kg148902.6149363.9216602.5212939.7285548.8282568.6
Total reinforcement difference, %+0.31%−1.72%−1.05%