Research Article
Examination of Structures Built with Tunnel Formwork in Terms of Strength and Cost according to the Earthquake Regulations of 2007 and 2018
| | 5 floors | 10 floors | 15 floors | 2007 | 2018 | 2007 | 2018 | 2007 | 2018 |
| BS30 concrete, m³ | 1987.2 | 1987.2 | 2981.8 | 2981.8 | 3977.5 | 3977.5 | Concrete formwork, –m2 | 10413.5 | 10413.5 | 18831.0 | 18831.0 | 27335.7 | 27335.7 | Base slab | 120.7 | 120.7 | 120.7 | 120.7 | 120.7 | 120.7 | Shear wall | 1086.0 | 1086.0 | 1071.8 | 1071.8 | 1071.8 | 1071.8 | Flooring | 577.2 | 577.2 | 577.2 | 577.2 | 577.2 | 577.2 | Beam | 52.2 | 52.2 | 51.9 | 51.9 | 51.9 | 51.9 | S420C reinforcement (thin), kg | 66252.4 | 66363.9 | 119065.6 | 114285.7 | 170829.6 | 162764.8 | S420C reinforcement (thick), kg | 82650.2 | 83000.0 | 97536.9 | 98654.0 | 114719.3 | 119803.8 | S420C reinforcement (total), kg | 148902.6 | 149363.9 | 216602.5 | 212939.7 | 285548.8 | 282568.6 | Total reinforcement difference, % | | +0.31% | | −1.72% | | −1.05% |
|
|