Research Article
Emergency Resource Location and Allocation in Traffic Contingency Plan for Sports Mega-Event
| Parameters | Value |
| (construction cost of temporary facilities) | RMB 23,500 | (volume of materials) | 0.5 units | (volume of labor) | 1 unit | (cost of materials) | RMB 100 | (cost of labor) | RMB 150 | (facility capacity) | 100 units | (maximum rescue time) | 30 min | (probability of materials occupied) | 0.4 | (probability of human occupied) | 0.3 |
|
|