Research Article

Emergency Resource Location and Allocation in Traffic Contingency Plan for Sports Mega-Event

Table 6

Parameter assumptions.

ParametersValue

(construction cost of temporary facilities)RMB 23,500
(volume of materials)0.5 units
(volume of labor)1 unit
(cost of materials)RMB 100
(cost of labor)RMB 150
(facility capacity)100 units
(maximum rescue time)30 min
(probability of materials occupied)0.4
(probability of human occupied)0.3