Research Article

Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum

Figure 12

The construction process of arches. (a) Stage 5-1. (b) Stage 5-2. (c) Stage 5-3. (d) Stage 5-4.
(a)
(b)
(c)
(d)