Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum
Figure 18
The support structure of the station with and without steel pipe piles. (a) Without side piles. (b) With side piles.
(a) |
(b) |