Research Article
Investigation on the Influence Caused by Shield Tunneling: WSN Monitoring and Numerical Simulation
Table 2
Monitoring scheme of shield construction affected area.
| Monitoring object | Monitored parameters | Layout scheme of monitoring points | Measurement points |
| Adjacent buildings | Tilting | (1) The monitoring range is the buildings within 30 meters from the central line of the tunnel | 4 | (2) The building displacement monitoring points are arranged on the external wall or bearing column | (3) The distance between monitoring points along the external wall should be 10 m ∼ 15 m | (4) The intelligent terminal is arranged within the visual range of 100 meters of the inclination fulcrum |
| Shield segment | Clearance convergence | (1) The measuring points in the building area are arranged one for every 8 rings | 21 | (2) The measuring points of other sections are arranged one for every 20 rings | (3) One relay jump fulcrum is set every 90 meters (13 fulcrums in total), and the intelligent terminal is arranged in the tunnel starting shaft |
|
|