Research Article
Design and Application of a Digital System for Information Management and Synchronous Analysis in a Foundation Pit Group
Table 1
The difference between proposed system and common risk monitoring systems.
| ā | Common system | Proposed system |
| Modeling object | Single foundation pit with series of excavation stages | Information management of multiple excavation in foundation pit group |
| Research target | Analysis of stress and deformation characteristics during excavation from overall foundation pit | Interaction analysis in local time and space due to the superposition effect of multiple block and partition excavation |
| Data management | Articulating data directly in traditional Revit model files | Being more lightweight and compatible through digital-analog separation |
| Data analysis | Analysis of the monitoring data without the combination of excavation information | Carrying out the statistical analysis and dynamic management of abstract data in combination with the actual excavation information |
|
|