Research Article
Design and Application of a Digital System for Information Management and Synchronous Analysis in a Foundation Pit Group
Table 3
Simplified construction schedule for pits C1 and D.
| ā | Step | Condition | Depth (m) |
| Pit C1 | 1 | Surface soil removal | 0.5 | 2 | First floor excavation and strut installation | 4.7 | 3 | Second floor excavation and strut installation | 4.3 | 4 | Third floor excavation and strut installation | 4.35 | ā | Surface soil removal | 0.5 |
| Pit D | 1 | Surface soil removal | 0.5 | 2 | First floor excavation and strut installation | 4.1 | 3 | Second floor excavation and strut installation | 4.0 | 4 | Third floor excavation and strut installation | 3.8 | 5 | Fourth floor excavation and strut installation | 4.5 |
|
|