Simplified construction schedule for pits C1 and D.

ā€‰StepConditionDepth (m)

Pit C11Surface soil removal0.5
2First floor excavation and strut installation4.7
3Second floor excavation and strut installation4.3
4Third floor excavation and strut installation4.35
ā€‰Surface soil removal0.5

Pit D1Surface soil removal0.5
2First floor excavation and strut installation4.1
3Second floor excavation and strut installation4.0
4Third floor excavation and strut installation3.8
5Fourth floor excavation and strut installation4.5