Study on Settlement and Deformation of Urban Viaduct Caused by Subway Station Construction under Complicated Conditions

Table 2

Summary table of vertical accumulated settlement at key locations.

Serial numberMonitoring point numberCumulative settlement (mm)Position

1−0.7Sewage pipe
2−0.4Rainwater pipe
3−0.7High-pressure gas pipe
4−1Residential building