Research Article
Optimization of Construction Parameters and Deformation Characteristics of Large-Section Loess Tunnel: A Case Study from Xi’an Metro
Figure 1
Xi’an Metro Line 4 and double-sides heading method. (a) Direction of Xi’an Metro Line 4. (b) Subsection construction process of double-sides heading method. (c) Construction sequence of the longitudinal section of tunnel excavation.