Research Article

Optimization of Construction Parameters and Deformation Characteristics of Large-Section Loess Tunnel: A Case Study from Xi’an Metro

Figure 12

Vault settlement characteristics of caverns ①, ②, and ⑤. (a) Vault settlement curve of cavern ①. (b) Vault settlement curve of cavern ②. (c) Vault settlement curve of cavern ⑤. (d) Relationship between maximum vault settlement and excavation face distance (L3).
(a)
(b)
(c)
(d)