Research Article
Research on Surface Subsidence of Long-Span Underground Tunnel
Table 3
Main construction methods of underground excavation station of Subway Line 3.
| Number | Site name | Arch main surrounding rock grade | Construction methods |
| 1 | Wannianquan Road Station | IV~V | Open excavation method, CRD method, CD method, double-wall guide pit method, and step method | 2 | Junfeng Road Station | IV~V | Open excavation method, CRD method, CD method, double-wall guide pit method, and step method |
|
|