Research Article

Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method

Table 11

Risk acceptance criteria.

LevelAccept the rulesThe principle of disposalControl schemeResponse to the department

IUnacceptableRisk control measures must be taken to reduce risks, at least to acceptable or undesirable levelsThe risk of early warning and emergency response plan should be prepared, or the plan should be revised or adjustedThe competent government department and the construction party
IIDon’t want to acceptRisk management should be implemented to reduce risks, and the cost of risk reduction should not be higher than the loss after the risk occursRisk prevention and monitoring should be carried out, and risk management measures should be formulated
IIIAcceptableIt is advisable to implement risk management and take risk treatment measuresDaily management and monitoring should be strengthenedThe construction party
IVCan be ignoredRisk management can be implementedRoutine inspections can be conducted