Research Article
Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method
Table 11
Risk acceptance criteria.
| Level | Accept the rules | The principle of disposal | Control scheme | Response to the department |
| I | Unacceptable | Risk control measures must be taken to reduce risks, at least to acceptable or undesirable levels | The risk of early warning and emergency response plan should be prepared, or the plan should be revised or adjusted | The competent government department and the construction party | II | Don’t want to accept | Risk management should be implemented to reduce risks, and the cost of risk reduction should not be higher than the loss after the risk occurs | Risk prevention and monitoring should be carried out, and risk management measures should be formulated | III | Acceptable | It is advisable to implement risk management and take risk treatment measures | Daily management and monitoring should be strengthened | The construction party | IV | Can be ignored | Risk management can be implemented | Routine inspections can be conducted |
|
|