Research Article

Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method

Table 12

Worksites for civil construction of phase 1 of Subway Line M2.

The serial numberThe stationThe serial numberInterval

1Taishan road stop line
1Taishan road station✓2Taishan road station—Lijin road section (TBM)
2Lijin road station3Lijin road station—Taidong Station(TBM)
3Tatdong station4Taidong station—Yan an road Station (TBM)
4Yanan road station5Yan an road station—Zhiquan road station (TBM)
5Zhiquan road station6Zhiquan road station—May 4th square station area (TBM)
6May 4th square station7May 4th square station—Nanjing road station