Research Article

Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method

Table 13

List of surrounding buildings.

NamePositionFloorBasics

Qingdao university incubation and entrepreneurship centerSouthside of the station17 floors, 4 floors undergroundRaft foundation
BroadwayOn the south side of the station, the distance between the basement and the main structure of the station is about 11 m.4 floors
Residential buildingIt is about 5.3 m away from the entrance and exit b in the north8 floors