Research Article
Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method
Table 2
Criteria for the probability grade of risk occurrence.
| ||||||||||||||||||||||||||||||||||||
Note: 1: Use frequency to replace probability when the value is hard to obtain. 2: The probability for the risk occurrence should be quantified based on the specific target’s unit project, unit time, or unit length. |