Research Article

Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method

Table 2

Criteria for the probability grade of risk occurrence.

Level12345

The accident descriptionFrequentPossibleOnce in a whileRareImpossibility
Interval probabilityP ≥ 10%1% ≤ P < 10%0.1% ≤ P < 1%0.01% ≤ P < 0.1%P < 0.01%

Note: 1: Use frequency to replace probability when the value is hard to obtain. 2: The probability for the risk occurrence should be quantified based on the specific target’s unit project, unit time, or unit length.