Research Article
Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method
Table 37
Construction risk judgment matrix.
| ā | Construction risk judgment matrix | | | The risk index | Total risk index | WE02 A | WE02 B | WE02 C |
| WE02 A | 1 | 5 | 3 | 2.466212 | 65.06% | 6.9 | 6.72 | WE02 B | 1/5 | 1 | 3 | 0.843433 | 22.25% | 6.5 | WE02 C | 1/3 | 1/3 | 1 | 0.48075 | 12.68% | 6.18 |
|
|