Numerical Simulation of Deep Foundation Pit Construction under Complex Site Conditions

Table 7

The ground surface settlement about DBC7-3 to DBC7-5.

Time notesDBC7-3DBC7-4DBC7-5

2019.4.201.91−0.73−0.38
2019.4.231.34−1.18−0.79
2019.4.261.04−1.4−0.99
2019.4.290.52−1.8−1.33
2019.5.020.12−2.12−1.58
2019.5.050.08−2.46−1.89
2019.5.080.09−2.57−2.02
2019.5.110.02−2.72−2.12
2019.5.14−0.93−2.76−2.17
2019.5.17−0.98−2.86−2.23
2019.5.20−1.02−2.98−2.27
2019.5.23−1.63−3.56−3.02